Finally got some more work done on my B-25 over the weekend so here's what I've done. I've added the other side of the nose section as well as completely replaced the control mechanism for the elevator control to using beams as the original way of doing that (using axles) wasn't going to work. I've also run the rudder control mechanism to the tail as well although I haven't added the actual rudders in yet.
I also came up with a preliminary design for the top turret.
And thats everything. Till next time.
No comments:
Post a Comment